translation SiteMap Favourite

What is the lead time?

   What is the production time?
   All the production instruction will be arranged only when our bank confirmed the payment or payment in advance; please kindly note there is a short remittance time (from 1 to 5 working-time days, it is upto the bank system relationship)
   Production time is different according to the pump type and order quantity. Usually, the metering pump has a longer production time than other small pump, and the more quantity, the much more production time needed.

 

   What is the shipping time?
   As for the shipping time(sea shipping), it is up to how far the destination port is from Shanghai Port. Bellow is some referred shipping time about some seaports around the world.